Spot replace
One soft sheet
Priced per sheet. We don't bury decking in the base bid.
Tear-Off to Warranty
Most homes around here come off old and go on new in one day. Tear off to the wood deck, replace anything rotted, code-spec ice and water shield, then GAF or IKO architectural shingles. We file the manufacturer warranty in your name when we're done.
My roof was in bad shape and they did a complete tear off and new shingles in one day. Excellent quality and professional job. Great pricing on top of everything. Five stars for sure.
From start to finish the Elite team was there to answer all my questions. They arrived early and had most everything done in one day. Very pleased with my new roof.
Most homes come off old and go on new in one day. The order doesn't change:
Tarps, plywood, dump trailer, AC unit covered.
Every side photographed before a shingle moves.
Old shingles, nails, felt in one pass. Three to five hours on an average home.
Drip edge, ice and water shield 24 inches past the interior wall (code minimum), underlayment, step flashing, pipe boots, shingles.
Ridge vent cut to your attic. Magnet sweep. Final walk-through before we leave.
A one-day install runs into two or three with a second tear-off layer, mostly soft decking, or a rain shutdown. We'll tell you which side of that line you're on before we start.
Decking is the line item that turns a clean quote into a surprise bill. Most homes keep 80 to 95% of the original deck. When we find bad sheets:
Spot replace
Priced per sheet. We don't bury decking in the base bid.
Cluster replace
Cut goes back to the next solid framing member, not just visible damage.
Full re-deck
A third or more soft means full re-deck. Price and timeline in writing first.
Bids that promise no decking charges at all are usually padding the base bid. Any decking number should be in writing before tear-off.
A correct install should make 20 to 30 years. Most that come up short failed for one of these:
Walk the perimeter every spring. Clear gutters twice a year. Inspections at year 10 and year 15.
Manufacturer product
Standard on every name-brand shingle. Lifetime limited on most architectural lines. Doesn't cover the install.
Workmanship
Belongs to the roofer, not the manufacturer. Our workmanship warranty is 4 years, covering flashing, fastener placement, deck prep, and ventilation. Always get it in writing.
System warranty
GAF Golden Pledge, IKO Iron Clad, CertainTeed Integrity. Certified contractors only. Registered inside 45 to 90 days. We file it.
Save the certificate, the invoice, and a few install-day photos in one folder. That's everything you need for a future claim or a sale.
Most asphalt-shingle replacements on a typical single-family home are one day, start to finish. Steep pitches, second-layer tear-offs, larger square footage, or weather delays stretch it to two. Permit pull, material delivery, and inspection close-out add a few days on either side of the install itself. Cedar shake or slate is a different conversation; those run a week or more. We give you a written timeline before any tear-off.
For homeowners home that day, the schedule that matters: trucks roll in by 7 AM, hammers stop around 5 PM. Loudest window is tear-off, roughly 8 to 11. Plan calls and meetings outside that. The ridge-vent cut is the only step that opens the attic to outside air, usually mid-afternoon and lasting about 90 minutes, so pull anything heat-sensitive (instruments, attic electronics) off the floor below that line.
We check intake at the soffits and exhaust at the ridge before cutting any new vent. There's a code-required ratio behind it. What matters most is intake. A new ridge vent over a blocked soffit pulls warm air out of your living space all winter.
You won't, and neither will any honest roofer, until tear-off is half done. The forecast is easier than the bid: 1990s-and-newer OSB usually holds at 90 percent or better. Pre-1980 plywood, anything with prior ice damming, or any home with a vent fan dumping into the attic instead of out the roof drops to 70 percent or lower. Get the per-sheet replacement price in writing on the bid, not negotiated mid-tear-off.
Not for the warranties we install. GAF System Plus has to be registered by a certified contractor inside 45 days. IKO Iron Clad has to be filed by an IKO ROOFPRO contractor inside 90 days. Standard shingle warranties don't require registration.
Three triggers, not a calendar. After any wind event above 50 mph (NOAA storm reports), after any hail event regardless of stone size, and at the year-10 mark to confirm sealant lines, pipe boots, and ridge cap are still tight. Routine annual inspections without a trigger event are mostly upsell. Past year 20, annual makes sense because the failure modes start clustering.